Skip to content
All advice

· By Rosa Halden · 1 min read

An electrical inspection: what happens on the day

Landlord, buyer or just curious: what an EICR involves, how long the power is off, and what the codes in the report mean.

An open tool bag on a wooden floor with an installation tester, test leads, a torch and screwdrivers

An Electrical Installation Condition Report (EICR) is a health check for your wiring. It takes three to four hours for a typical home.

  1. We start at the board, checking the earthing, the bonding and what protects each circuit.
  2. Each circuit is tested, with the power off for a few minutes at a time.
  3. We open a sample of sockets, switches and light fittings to look inside.
  4. You get a report within two days.

The codes

  • C1: danger present. We make it safe before we leave.
  • C2: potentially dangerous. Needs fixing soon, and a rental fails until it is.
  • C3: improvement recommended. Not unsafe, but not today’s standard.
  • FI: further investigation needed.

Landlords need a satisfactory report every five years; homeowners every ten, or when buying.

Ask Halden's helper

Questions about jobs, prices and when we can come

Hi! Ask me what Halden Electrical does, what it costs, which areas we cover or how to book a survey.

Accent

Get itGet this template: Spark on WPTom