Semi-detached house, Brook End ·
An EV charger on a brick drive
A 7 kW smart charger by the drive, fed in neat grey conduit along the side wall from a new isolator.
- Time
- Half a day
- Cost
- £895 including the charger
The board was in the kitchen at the back of the house, so the cable runs through the garage and along the side wall in UV-proof conduit to an isolator next to the charger. We checked the supply, fitted the earthing the charger needs, and set it to the family’s off-peak hours.
The grant and the network notification were sent the same week.

